
https://aidspan.org/?post_type=wpdmpro&p=27333
Author:
AIdspan
Article Type:Article Number:

- Download 13
- File Size 4.00 KB
- File Count 1
- Create Date 2023-05-15
- Last Updated 2023-06-27
https://aidspan.org/?post_type=wpdmpro&p=27333
This Aidspan working paper (No. 01/13) describes the opinions and experiences of government and non-government principal recipients as related by them in a survey conducted by Aidspan in December 2012. Topics covered include communications, relationships, the grant implementation process, reporting systems and capacity building.
Michelange Muberuka
0