GLOBAL FUND IS MAKING PROGRESS IN IMPROVING CONSULTANT MANAGEMENT PROCESSES: OIG
Author:
David Garmaise
Article Type:Article Number: 4
Use of consultants in 2016 cut almost in half compared to 2015
ABSTRACT An audit by the Office of the Inspector General into the planning and management of consultants finds that the Global Fund is making good progress, particularly in the last year and half. The use of consultants, as a percentage of total staff costs, has been reduced from 35% in 2015 to 19% in 2016.
The Secretariat has made progress in improving consultant management processes, particularly over the last year and half. Consultant costs, as a percentage of total staff costs, have gone down from 35% in 2015 to 19% in 2016. Processes and compliance have improved. The Secretariat is aware of several outstanding weaknesses and has various ongoing initiatives to remediate them.
These were among the findings of an audit on the planning and management of consultants conducted by the Office of the Inspector General (OIG). AĀ reportĀ on the audit was released on 2 August 2017.
In 2016, the OIG said, the Secretariat initiated consultant procurement planning and zero-based budgeting. The first annual consultantsā procurement plan was completed in 2017. However, the OIG noted that the Global Fund has not yet developed robust strategic workforce planning processes; and that the pros and cons of engaging employees as opposed to long-term consultants are generally not analyzed. Currently, about 60% of the individual consultants are contracted for a period of more than one year. In some cases, the OIG said, long-term consultants were used after staff positions were denied due to an upper limit on staff costs.
The consultant planning and management cycle involves different units of the Secretariat, such as human resource management, budgeting and legal. The processes and controls for consultant management vary considerably across these units. The OIG said that a lack of clearly defined roles and accountability has limited the effectiveness of controls related to consultant management. It added that there is a need for increased institutional guidance and standardized controls.
The financial system used for managing consultant expenditures has strong controls, the OIG reported. However, this system is not designed to cover additional management information needs, which are therefore being addressed through manual processes. On the human resources side, the OIG said, a system is not yet in place to provide easy and reliable access to key information on consultants for effective strategic planning and operational decision-making. The OIG noted that software improvements are currently being designed which will address these gaps.
With respect to contracting and performance management of consultants, the OIG stated that ongoing initiatives have led to adequate on-boarding guidance for consultants, improved integrity checks, and generally well-defined scope of work. However, the OIG said, improvements are needed in the areas of compliance with contractual requirements, reference checks of consultants, and tracking and recording of performance.
In summary, the table below lists the four aspects of consultant management examined by the OIG in this audit, and the OIGās rating for each one.
Table: Aspects of consultant management, showing the rating for each
There are four tiers in the OIGās rating scheme: āeffectiveā; āpartially effectiveā; āneeds significant improvementā; and āineffective.ā
Agreed management actions
In response to the OIGās findings, the Secretariat agreed to incorporate detailed guidance to its various units on the use of consultants; to define roles and responsibilities for key aspects of consultant management; and to enhance controls on contractual compliance, reference checking and performance tracking. The Secretariat will also analyze the costs, benefits and risks for existing long-term consultants against staffing options.
Previously identified issues
The OIG audit report on the Global Fund Procurement and Supply Chain Management in 2015 (GF-OIG-15-008) covered the recruitment and selection of consultants. Significant gaps were identified; for example, 74% of non-health procurements sampled, including consultants, were selected using the āexception to competitionā option. The audit also confirmed earlier findings from a European Commission audit of the Global Fund, about material weaknesses in procurement-related systems, controls, rules and procedures.
Subsequent OIG reports (GF-OIG-16-016 and GF-OIG-16-026) covering consultant selection highlighted similar weaknesses. Other selection weaknesses were also noted, including missing critical bid evaluation details in the bidding documents; arbitrary use of different evaluation methods in selection which were not pre-defined; failure to prepare technical evaluation reports; evaluation committee members not declaring potential conflicts of interest; and non-competitive determination of consulting fee rates.
In response to these various findings on the selection processes, the Secretariat is currently revising all procurement regulations under an ongoing Procurement Improvement Plan, a joint initiative of the finance and sourcing teams. This plan is incorporating strengthened controls in the consultant selection processes, including stricter rules on the use of āexceptions to competition,ā approval thresholds, and conflict of interest declarations. The improvements also include clear definitions of compliance roles, accountabilities and reporting mechanisms. The revisions are captured in the agreed management actions from the earlier OIG reports, with target dates of June 2017.
All OIG reports are available on theĀ audit and investigations pageĀ of the OIG section of the Global Fundās website.Ā